Project Description
Project will replace the existing two-lane Flamingo Boulevard from 776 to a point north of Edgewater Drive and the existing remaining section of two-lane Edgewater Drive from Midway Boulevard to Collingswood Boulevard with a new four-lane roadway. The project will also connect Flamingo Boulevard from its southernmost curve to the intersection of Edgewater Drive and Collingswood Boulevard, creating a new alignment for the roadways. Additionally, intersection improvements at 776 and Flamingo Boulevard will be included.
The project is split into 3 phases, identified as phases 3, 4, & 5. The design will include all three phases and the construction will be multiphase.
项目位置
Flamingo Boulevard from 776 to a point north of Edgewater Drive, connecting Flamingo Boulevard from its southernmost curve to the intersection of Edgewater Drive and Collingswood Boulevard, including Edgewater Drive from Midway Boulevard to Collingswood Boulevard.
最新的更新
Johnson Engineering has been selected as the design firm for this project. The county is working with the firm to design all project phases. The design and permitting portion is expected to take about two and half years from the notice to proceed date of March 1, 2022.
- 90% of field survey work has been completed.
- Protected species and wetlands evalution in process.
- 90% of geotechnical field work has been completed.
- 60% roadway plans are under review.
- 60% bridge plans are under review.
- 60% utility plans are under review.
- The process has started to obtain the necessary SWFWMD permit.
- Coordination to resolve outside utility conflicts is ongoing.
预算
阶段 | 成本 |
---|---|
设计 | $5,068,415 |
2014 Sales Tax Extension for the design of phases 3, 4, & 5.
2020 Sales Tax Extension for the construction of phase 4, in the future.
时间表
阶段 | Estimated Start Date | Forecast Completion | Actual Completion |
---|---|---|---|
设计 Development | 03/01/2022 | 09/01/2024 | |
建设 | 09/01/2024 |
项目阶段
设计 Development
最后一次更新
10/23/2023
项目经理
林赛•约翰逊
公共关系
特蕾西·多尔蒂
Email 公共关系
项目数量
c412102
Sponsor Department
公共工程
设计 Engineer/Architect
Johnson Engineering
建设 Contractor
TBD